Skip to main content

GEOSPATIAL ASSESSMENTS FOR CWIS PLANNING

Assessments of Hard to Reach (HTR) Settlements

Data Requirements Road Network with road width or categories Building footprint and type of b...

Stepwise Process Flow Details

Step 1: Prepare the Data o Gather geospatial data on building locations and road networks in co...

Output Application

The output here provides a clear understanding of the settlements accessible by large and small v...

Assessments of Waterlogging/Flood Prone Settlements

Data Requirements Elevation data Waterbodies/ Rivers Past Flood data with location High Flo...

Stepwise Process Flow Details

Step 1: Import Data o Open QGIS and load your Digital Elevation Model (DEM) data representing...

Output Application

Areas with waterlogging risks present operational challenges for the smooth functioning of toil...

Assessment of Drainage Network with Orders and Density

Data Requirements 1.     Elevation data 2.     Waterbodies/ Rivers

Stepwise Process Flow Details

Step-by-step instructions in paragraph form for identifying natural drainage network and catchmen...

Output Application

A drainage network map helps delineate the different watersheds within a region, which play a sig...

Assessment for Identifying Settlements Close to Waterbodies

Data Requirements Waterbodies/ Rivers Building footprint

Stepwise Process Flow Details

Stepwise Process Flow Details Step 1: Overlay the Data Layers Start by overlaying the water...

Output Application

Areas in proximity to water tend to have a heightened risk of untreated wastewater encroaching in...

Assessments for Identifying Economic Vulnerability Assessment

Data Requirements Building footprint with Typology Slum boundary

Stepwise Process Flow Details

Step 1: Determine the Building Typology The first step involves examining the building data ...

Output Application

Settlements identified as economically vulnerable are given priority when designing and implement...

Assessment for Settlement Identification for Bulk Volume of Wastewater Generation

Data Requirements 1. Building with type of use and number of floors

Stepwise Process Flow Details

Step 1: Gather Building Data The initial step in the process involves gathering the relevant...

Output Application

Buildings that produce significant wastewater should be prioritized for on-site treatment, partic...

Assessment for Containment Improvement Scheme at Town Scale

Data Requirements Output map of settlement near to water bodies, Output map of settlement wit...

Stepwise Process Flow Details

Step 1: Gather Spatial Layers of Containment Risk This initial step involves the collection of ...

Output Application

Location-based information can assist in tracking the evolution of improved containment systems o...

Assessments for Public Toilet Gap and Required Upgrades

Data Requirements Major commercial and institutional land uses Network Dataset using the road ne...

Stepwise Process Flow Details

Step 1: Assess the Walkability Factor For this process, a network analysis of the study regi...

Output Application

Implementing and adapting these recommendations would contribute to an adequate distribution and ...

Assessment of Pan City Level Settlements Proximity to Existing and Proposed FSTP

Data Requirements Location of existing and proposed FSTPs Network dataset using the road network...

Stepwise Process Flow Details

Step 1: Load the Network Dataset Load the road network shapefile in QGIS, which you created ...

Output Application

This type of analysis aids in assessing the locational suitability of both existing and proposed ...